Operations/PG01 platform

WIP Pipeline

Lots in process at foundry and OSAT partners — the latest supplier report is the picture

On hold at supplier

as reported in the last supplier file
1lot
1,240 units

Past expected date

1lot
940 units

Lots by stage

Each stage in its own UOM
WAFER
16 wafers
PROBE
8 wafers
DIE
8,430 die
ASSEMBLY
1,980 units
FINAL TEST
3,800 units

Pipeline lots by stage

Read-only — every figure comes from the uploaded supplier report.
9 of 9 lots
LotParent lotPartGradeVoltageLocationQtyUOMCurrent stepSteps% completeYieldPOExpectedSupplier statusLast reportedRemarks
WAFER(2)
5L0F6F2-93530-01FPG01-AF-LDSFAB-EU8WAFERSUBM formation90/96
94%
Sep 18, 2026in process
5L0F6F2-93530-02FPG01-AF-LDSFAB-EU8WAFERSBackside metal deposition86/96
90%
Oct 09, 2026in processOn hold before UBM formation → released
PROBE(1)
5L0F6F2-93118-04WPG01-AF-LDSFAB-ASIA8WAFERSWafer sort — hot probe3/5
60%
Aug 26, 2026in process
DIE(2)
0518HTC7DPG01-AF-DS-121200VOSAT-PH4,820DIEDie visual inspection2/4
50%
98.4%PROD00003341Aug 21, 2026in process
0518HTC8DPG01-AF-DS-08800VOSAT-PH3,610DIEDie bank — awaiting assembly release3/4
75%
97.6%PROD00003342Aug 19, 2026in process
ASSEMBLY(1)
0526HTC2APG01-12002641200VOSAT-PH1,980UNITSWire bond6/11
55%
99%PROD00003360Sep 02, 2026in process
FINAL TEST(3)
0526PTC9TPG01-1200264-80801200VOSAT-PH1,620UNITSFinal test — room temp2/3
67%
98.2%PROD00003371Aug 27, 2026in process
0526PTC10TPG01-800264-8080800VOSAT-PH1,240UNITSFinal test — hot bin verification1/3
33%
96.9%PROD00003372Sep 08, 2026on holdAwaiting correlation units from test engineering
0526PTC11TPG01-1200264-50501200VOSAT-PH940UNITSFinal test complete — awaiting FG posting3/3
100%
97.9%PROD00003373Aug 03, 2026completed